The design requirements were based on the information and requirements provided by the client who required a permanent power supply for their temporary chillers.

Our works included the following services:

  • Installation of ladder from existing tray work within the clients plant room
  • Installation of ladder in the clients switch room
  • Installation of h frame and fused isolator in the clients switch room
  • Re-directing of existing armoured cable
  • Installation of Unistrut frame for 2 metal enclosures
  • Installation of a 630amp isolator inside each enclosure
  • Connection and termination of cables
  • Testing of the installation