Case Study

Substation Installation

G2 Energy

Control Cabling Installation

Installation of control cabling and final connection into control panels for off grid battery storage systems

The project was based on information and requirements given by the client.

We installed cables for the automation of charging and discharging of the battery storage facility to store renewable energy generated during low demand and supplied to the grid on high demand.

Electrical Distribution System Installers

Our works included the following services

  • Up to 50 core cables installed for control and monitoring
  • Installing power supplies for air conditioning
  • Site set up of local power and lighting