Electrical Installation Sandwich, Kent

Electrical Installation Sandwich, Kent

The project was based on information and requirements given by the client.

Our works included the following services:

  • Full design of the electrical installation
  • Full installation details provided by the client
  • 630A supply and new cable route required for a temporary chiller
  • 2 x 240mm 3c SWA Cables redirected from existing supply
  • New ladder installed and connected to existing ladder
  • Ladder suspended on Unistrut and threaded rod from the ceiling
  • Existing cables redirected and rerouted on new ladder
  • New ladder installed vertically to new Switch Fused Isolator
  • Installation of 1 x 630A Switch Fused Isolator
  • Cables terminated into a 630A Switch Fused Isolato
  • Connection and termination
  • Final test and inspection