Supplies for new training academy
Sittingbourne, Kent
Installed 3 phase distribution and hook up for training cabins.
We installed a Myenergi Zappi charge point for one of our clients who had just purchased an electric vehicle and needed a charge point installed. The OLEV grant was coming to and end so we ensured we met the time frame so our client would still qualify for the grant. We were able to ensure that we installed the most suitable charger to meet their needs and requirements.
Our works included the following services :