Please feel free to view our latest case studies. If you would like to learn more please don't hesitate to contact one of our team.
Sittingbourne, Kent
Demelza, Sittingbourne
Showing 12 out of 21 case studies
Installed 3 phase distribution and hook up for training cabins.
Installation of control cabling and final connection into control panels for off grid battery storage systems
Installation of control wiring for an emergency call system within the facilities and welfare location.
Surrey
Myenergi Zappi domestic charger installation.
Installation of Collingwood external spike lights.
Lordswood
LED floodlight upgrade in Lordswood. Photocell sensors with dusk to dawn control.
Kent
Myenergi Zappi EV charger install full test and inspection.
Double charge Rolec pedestal installation under the workplace grant.
Southend-on-Sea
Design installation and commissioning for the refurbishment of the offices and the full installation for the new hanger and associated workshop area.
Gillingham, Kent
LED lighting upgrade at Crossfit Medway
Sandwich, Kent
Cable move and temporary chiller supply.
The project was designed to replace existing florescent lighting with LED high bay lighting, as per the requirements specified by the client.